Commit graph

2 commits

Author SHA1 Message Date
Michael Tretter
21b7f3b87c soc: xilinx: move PM_INIT_FINALIZE to zynqmp_pm_domains driver
[ Upstream commit 7fd890b89dea55eb5866640eb8befad26d558161 ]

PM_INIT_FINALIZE tells the PMU FW that Linux is able to handle the power
management nodes that are provided by the PMU FW. Nodes that are not
requested are shut down after this call.

Calling PM_INIT_FINALIZE from the zynqmp_power driver is wrong. The PM
node request mechanism is implemented in the zynqmp_pm_domains driver,
which must also call PM_INIT_FINALIZE.

Due to the behavior of the PMU FW, all devices must be powered up before
PM_INIT_FINALIZE is called, because otherwise the devices might
misbehave. Calling PM_INIT_FINALIZE from the sync_state device callback
ensures that all users probed successfully before the PMU FW is allowed
to power off unused domains.

Signed-off-by: Michael Tretter <m.tretter@pengutronix.de>
Acked-by: Michal Simek <michal.simek@xilinx.com>
Acked-by: Rajan Vaja <rajan.vaja@xilinx.com>
Link: https://lore.kernel.org/r/20210825150313.4033156-2-m.tretter@pengutronix.de
Signed-off-by: Michal Simek <michal.simek@xilinx.com>
Stable-dep-of: 9b003e14801c ("drivers: soc: xilinx: check return status of get_api_version()")
Signed-off-by: Sasha Levin <sashal@kernel.org>
2024-11-23 23:20:19 +01:00
Gabriel2392
7ed7ee9edf Import A536BXXU9EXDC 2024-06-15 16:02:09 -03:00